Case Studies

This project involved the construction of a sports pavilion at Whitefriars College, an independent secondary school in Donvale, Victoria.
Case study on how FastRock net gabion bags were used to fix flood-affected Brisbane boardwalk.
An informative Case Study on the recent project to build a piling platform in Port Kembla, where TerraStop High Strength woven geotextile was used.
An information Case Study on the new $12.5 million dollar intersection upgrade at Gisborne.
As part of the wide-ranging Level Crossing Removal Project in Victoria, a rail crossing is being removed in Manchester Road, Mooroolbark. In its place, an elevated rail platform is being constructed, featuring a parallel retaining wall structure that requires reliable stabilisation and drainage.
A fast and cost-effective Geosynthetic solution for the newly opened Jindabyne ski ramp and airbag jump.
How our PFA Geotextiles were used for the new Melbourne’s Winneke Solar Farm project.
Geosynthetics Result in Cost Savings for Green Organics Facility. Repurpose It is a Melbourne based organic waste recycling facility that aims to divert all organic waste from landfill to ultimately eliminate the state’s waste problem.
The bridge upgrade aims to deliver strengthening works underneath the bridge and will ultimately provide a stronger bridge that will last decades into the future.
The scope of works for this $103 million DTMR project includes the upgrade of 12 kilometres of the Bruce Highway including the construction of two new bridges

Product Enquiry