EROWeb® Cord

Product Code: SWCORD8-100

EROWeb® Cord is used when installing geocells such as EROWeb. Used to hold and secure large sections of geocell, it is installed by running the cord through holes in the geocell wall, in long horizontal or vertical runs.

Description

EROWeb® Cord is used when installing geocells such as EROWeb. Used to hold and secure large sections of geocell, it is installed by running the cord through holes in the geocell wall, in long horizontal or vertical runs. EROWeb cord can be useful for slopes and surfaces with multiple planes, as it holds the geocell material in the correct position without allowing it to move, shift or collapse during installation.

Size: 8mm x 100m
Colours: Orange or White

Specifications

Applications

  • Use with EROWeb and other geocells

Resources

Latest Catalogue

Download

Description

EROWeb® Cord is used when installing geocells such as EROWeb. Used to hold and secure large sections of geocell, it is installed by running the cord through holes in the geocell wall, in long horizontal or vertical runs. EROWeb cord can be useful for slopes and surfaces with multiple planes, as it holds the geocell material in the correct position without allowing it to move, shift or collapse during installation.

Size: 8mm x 100m
Colours: Orange or White

Reviews

There are no reviews yet.

Be the first to review “EROWeb® Cord”

Your email address will not be published. Required fields are marked *

Meet the Team

Raymond Chow has been involved with the geosynthetics industry for over 15 years. Graduating with a First Class Honours degree in Civil Engineering at the University of Sydney, Raymond specializes in retaining wall designs, soft ground improvement, channel and slope protection, and on-site storm water management.

Raymond has been on various technical committees addressing geosynthetics, including testing, specification and durability issues.

Join our next session by emailing us at technical@polyfabrics.com.au
A great blog explaining what turf reinforcement mats (TRMs) are, how they work and what types of TRMs PFA has to offer.
The difference and purpose of Flocculants and Coagulants.
This project involved the construction of a sports pavilion at Whitefriars College, an independent secondary school in Donvale, Victoria.

HDPE Hydroliner®

Owned and managed by Sydney Water, Johnstons Creek is a concrete stormwater channel constructed in 1898 and one of Sydney’s earliest purpose-built stormwater drains. This project involves the naturalisation of the creek, located near Glebe in Sydney’s inner west.

HDPE Hydroliner®

Owned and managed by Sydney Water, Johnstons Creek is a concrete stormwater channel constructed in 1898 and one of Sydney’s earliest purpose-built stormwater drains. This project involves the naturalisation of the creek, located near Glebe in Sydney’s inner west.

HDPE Hydroliner®

Owned and managed by Sydney Water, Johnstons Creek is a concrete stormwater channel constructed in 1898 and one of Sydney’s earliest purpose-built stormwater drains. This project involves the naturalisation of the creek, located near Glebe in Sydney’s inner west.

Product Enquiry