admin

Erosion Control for Penrith Flood Plains

Polyfabrics’ TerraMat® RF80, a high-strength steel mesh with anchoring ability, was used to stabilise the embankment for the $35M Log Cabin Hotel redevelopment in Penrith.

Geosynthetic solution for Bishop Drive, Mollymook

Bishop Drive links the Princes Highway with the popular holiday destinations of Narrawallee and Mollymook on NSW’s South Coast.

A complete stormwater detention solution from Polyfabrics

Polyfabrics can provide design assistance throughout the 3 phases critical to the implementation of a successful onsite detention system.

How Polyfabrics helped deliver cost savings for VicRoads highway project

The Victorian Government recently completed a project to improve safety on the Midland Highway, reducing road trauma and saving lives.

HDPE Bio-liner® Johnstons Creek Naturalisation

Polyfabrics’ Bio-liner® HDPE Composite Liner was used as a cost-effective solution to create a wetland for the renewal of Johnstons Creek in Sydney.

Eroweb Cellular Confinement for Landslide Remediation

The purpose of using geogrids stability on slopes channels when filled with locally sourced material.

Construction of Whitefriars College Multi Sports Courts

Revolutionizing Whitefriars College sports pavilion with mastaGRID® GT 30/30: conquer subgrade challenges, save time, cost, and the environment.

Flexible gabions fix flood-affected Brisbane boardwalk

Case study on how FastRock net gabion bags were used to fix flood-affected Brisbane boardwalk.

Piling platform reinforced with Terrastop® High Strength woven from Polyfabrics

An informative Case Study on the recent project to build a piling platform in Port Kembla, where TerraStop High Strength woven geotextile was used.

Melbourne Road Intersection Upgrade, Gisborne

An information Case Study on the new $12.5 million dollar intersection upgrade at Gisborne.

Stabilisation and Drainage Solutions for Victorian Rail Platform

As part of the wide-ranging Level Crossing Removal Project in Victoria, a rail crossing is being removed in Manchester Road, Mooroolbark. In its place, an elevated rail platform is being constructed, featuring a parallel retaining wall structure that requires reliable stabilisation and drainage.

Fast cost-effective Geosynthetic solution for Iconic Jindabyne Ski Ramp

A fast and cost-effective Geosynthetic solution for the newly opened Jindabyne ski ramp and airbag jump.

Geotextiles for Melbourne’s Winneke Solar Farm

How our PFA Geotextiles were used for the new Melbourne’s Winneke Solar Farm project.

Geosynthetics Result in Cost Savings for Green Organics Facility

Geosynthetics Result in Cost Savings for Green Organics Facility. Repurpose It is a Melbourne based organic waste recycling facility that aims to divert all organic waste from landfill to ultimately eliminate the state’s waste problem.

Close Panel

Products Enquiry

No item.
Go and add products